Below are the major projects being worked on in New Hampshire:

- Garvins to Deerfield (G146) Structure Replacement Project - Replacing 176 structures with weathered steel.
- Farmwood Substation to Webster Substation (F139 / V182) Simultaneous Line Rebuild Project - Replacing 289 structures and installing fiber optic cable.
- Beebe River to Whitefield (X178) Line Rebuild Project - Replacing structures with weathering steel structures of a similar design.
- Webster Substation to Laconia Substation (J125 Line) Structure Replacement Project - Replacing 137 laminate wood monopole structures with weathered steel monopole structures.
- Greggs Substation to Jackman Substation (F162 / A164) Simultaneous Line Rebuild Project - Replacing a total of 229 wooden H-frame with weathering steel H-frame structures.
- Whitefield to Berlin (S136) Line Rebuild Project - Replacing 212 structures and installing new conductors.
- Littleton to Sugar Hill (U199) Line Rebuild Project - Replace 108 structures with weathering steel.
- Whitefield to Littleton (Q195 and Q195 Tap) Line Rebuild Project - Replace Q195 transmission line and Q195 Tap with new weathered steel H-frame structures.